Gamesa, a Spanish owned wind-turbine manufacturer operating in Ebensburg, PA, will furlough 73 workers at the PA plant.The furlough will last 10 weeks or more.
A lower demand for blades is driving the cost-cutting furlough, along with the expired tax credit for renewable energy production. When the tax credit is extended, the furlough may end.
Read the full article here:
Speak Your Mind